Blueridge Films

Century Construction » Projects » Page 3 Blueridge Films Project Profile 25,300 SF manufacturing facility that includes an 8,800 SF warehouse addition. The original building included office and manufacturing spaces. It also included a dedicated 100,000-gallon fire...

Weidmuller

Century Construction » Projects » Page 3 Weidmuller Project Profile 27,000 SF plant expansion for Weidmuller USA. This facility increased the company’s engineering and production capabilities. In addition to new manufacturing space, this plant addition included new...

Industrial Labs & Training Center

Century Construction » Projects » Page 4 Industrial Labs & Training Center Project Profile Two 17,500 SF buildings with office, conference room, training, and testing spaces. The project also included a fire response training tower, interior catwalk mezzanines,...

Alstom Power

Century Construction » Projects » Page 4 Alstom Power Project Profile 18,000 SF manufacturing facility with parts storage, meeting, and 2 story office spaces. The facility also included a mezzanine. The building is a pre-engineered metal building system with the steel...

Industrial Control Offices

Century Construction » Projects » Page 4 Industrial Control Offices Project Profile 7,500 SF industrial office complete office renovation. The renovation was inside of an existing industrial complex and included 2 additions to the existing structure....
Skip to content