Century Construction » Pre-Engineered Metal Buildings Sheehy Ford Service Center Project Profile 24,000 SF service building for Sheehy Ford of Ashland. It included 23 service bays, parts storage, breakrooms and restrooms. The building is a pre-engineered metal...
Century Construction » Pre-Engineered Metal Buildings Elijah House Project Profile A new 12,000SF Multi-Purpose center for Elijah House Academy. The main center section of the building is a pre-engineered metal building structure and roof by Butler Manufacturing. The...
Century Construction » Pre-Engineered Metal Buildings County Waste Project Profile Development of 18-acre site with 28,500 SF recycle facility. The building a pre-engineered metal building system with the steel structure, wall panels, roof panels provided by Butler...
Century Construction » Pre-Engineered Metal Buildings JL Minter Project Profile 7,800 SF office/warehouse building for J.L. Minter Electrical Contractor. The building is a pre-engineered metal building system with the steel structure, wall panels, and roof panels...
Century Construction » Pre-Engineered Metal Buildings River City Distribution Center Project Profile 220,000 SF distribution center with a 5,000 square foot office area. The shell was constructed using a pre-engineered metal building system from Butler Manufacturing....