Century Construction » Projects »
Veritas – North Hall
Project Profile
Complete interior demolition and re-build for Veritas School’s Upper School Building. The outdated 12,000 SF building was transformed to a bright and functional space which incorporated many classical features. The entablature and column capitals in the lobby were made from hand crafted plaster, designed especially for this building. An elevator was installed as well as all new mechanical, electrical, plumbing, sprinkler, and fire alarm systems. It was a challenge to squeeze the designed functional space and all of the new equipment in the existing shell. The work required a high level of coordination with the design team and the contractors to make sure everything fit.